Product details
Model Number: T17990
Brand Name: TECH
Key Specifications/Special Features:
Product Name: Customized injection mold, rubber mold and die casting moldMold material: P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc.Information to quote: 2D, 3D, samples or pictures of multiple points of view with dimensions.Lead time for mold: 15--60days, on basis of the difficulty level
Service life: 500k-1000k shots
Cavity number of mold: Single cavity, Multiple cavity or one mold with different products
Runner system: Hot runner, Cold runner
Surface treatment: Words corrosion, Mirror polish, Frosted surface or textured surface
Main process: Milling, grinding, CNC, EDM, wire-electrode cutting, carved, electrospark, lathe, etc
Products: Automobiles, home appliances, medicine, daily necessities, sanitary wares, photographic equipment accessories, and construction fields, etc.
Software: SolidWorks, UG, CAD(IGS, X-T, STP), PDF
Mold design time: Within 3 days(generally)
Mold testing: All of the molds can be well tested before the shipments. Videos for testing the molds are available according to clients’ requirements.
Good packages: In strong wooden pallets to avoid any damages during the long transportation
Service life: 500k-1000k shots
Cavity number of mold: Single cavity, Multiple cavity or one mold with different products
Runner system: Hot runner, Cold runner
Surface treatment: Words corrosion, Mirror polish, Frosted surface or textured surface
Main process: Milling, grinding, CNC, EDM, wire-electrode cutting, carved, electrospark, lathe, etc
Products: Automobiles, home appliances, medicine, daily necessities, sanitary wares, photographic equipment accessories, and construction fields, etc.
Software: SolidWorks, UG, CAD(IGS, X-T, STP), PDF
Mold design time: Within 3 days(generally)
Mold testing: All of the molds can be well tested before the shipments. Videos for testing the molds are available according to clients’ requirements.
Good packages: In strong wooden pallets to avoid any damages during the long transportation
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 21 - 45 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- North America
- Western Europe